Container Terminal in Phase 3 Construction Project of Yantai


作者:admin 发布时间:2017-01-05 所属栏目:Container Terminals

There are2 benths in the container terminal of Phase IIl Construction Project of Yantai Port.which can accommodate two 50000 DWT container vessels simultaneously with the annual throughput capacity of 500000 TEU The quay line Is 543 m IOng with the berth depth at—14 m It is of the gravity-type caisson structure 50.5 t raiI—mounted container quay cranes with aft outreach of 50 m are used at the frount apron and boIh rail—mounted and tire—mounted gantry cranes used at the stock yard