The quay line of the container terminal of Phase III Construction Project of Yingkou Port is 826 m long with the alongside water depth at-14.0 m.It can accommodate one 50 000 DWT, one 35 000 DWT and one 20 000 DWT container vessels in combination, with th
相关介绍
The quay line of the container terminal of Phase III Construction Project of Yingkou Port is 826 m long with the alongside water depth at-14.0 m.It can accommodate one 50 000 DWT, one 35 000 DWT and one 20 000 DWT container vessels in combination, with the annual throughput capacity of 1 000 000 TEU.60 t rail-mounted container quay cranes are used at the front apron,and other container handling and transport equipment used at the stock yard.It is the gravity-type block wharf structure under the deepest water condition in China.