Container Terminal in Phase 3 Construction Project of Yantai
更新时间:2018-04-23 15:34:53点击次数:2135次
There are2 benths in the container terminal of Phase IIl Construction Project of Yantai Port.which can accommodate two 50000 DWT container vessels simultaneously with the annual throughput capacity of 500000 TEU The quay line Is 543 m IOng with the berth
相关介绍
There are2 benths in the container terminal of Phase IIl Construction Project of Yantai Port.which can accommodate two 50000 DWT container vessels simultaneously with the annual throughput capacity of 500000 TEU The quay line Is 543 m IOng with the berth depth at—14 m It is of the gravity-type caisson structure 50.5 t raiI—mounted container quay cranes with aft outreach of 50 m are used at the frount apron and boIh rail—mounted and tire—mounted gantry cranes used at the stock yard