EPC work, Coal Terminal for Tanjung Jati A (2X660MW) coal fired power plant, Ind

更新时间:2019-01-07 11:07:10点击次数:1078次
The work includes the construction of a coal berth with 8m water depth for handling ships up to 12,000 dwt. The coal berth is connected to the power plant by a conveyer trestle and is provided with two sets of 2000 t/h ship unloaders. The berth is also pr
相关介绍
The work includes the construction of a coal berth with 8m water depth for handling ships up to 12,000 dwt. The coal berth is connected to the power plant by a conveyer trestle and is provided with two sets of 2000 t/h ship unloaders. The berth is also provided with utilities such as power supply, communications, control, heating & ventilation, fire fighting, water supply & drainage, environmental protection etc.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号