Phase 1 Project of 12.5m Deepwater Channel at the Lower Reach of the Yangtze Riv

更新时间:2019-01-08 13:28:40点击次数:559次
Submerged dike in total length of 18,000m, eight groins in total length of 3,510m, associated navigation aids. The project is divided into two packages.
相关介绍
Submerged dike in total length of 18,000m, eight groins in total length of 3,510m, associated navigation aids. The project is divided into two packages.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号