Monday to Friday :8:00-17:00
Fax:022-28341925
Tel:022-28160808
E-mail:fdine@fdine.com.cn
Address:Home > Consultation > Consulting design > Ports, terminals > Passenger Terminals, Ro-Ro Ter
2018-04-23
Five berth for handing steel products on ships ranging from 10 000 DWT to 50 000 DWT along the quay in total length of 1 031m. with throughput capacity of 5.14 mtpa. ...
2018-04-23
One general cargo berth for ships up to 50 000 DWT, with deck level at 4.2 m, berth depth at -14m, wharf structure length of 162.65 m, quay length of 122.65m....
2018-04-23
Two general cargo berths in total quay length of 458 m with throughput capacity of 670 000 t/y. ...
2018-04-23
New 1 t class cargo berths, annual design capacity of 300 thousand T....
2018-04-23
Two 20 000 DWT general cargo berths in total quay length of 418 m...
2018-04-23
Construction of 35 thousand T berths, 10 thousand T class berths, seven, the 5 Berth design capacity of 2 million 190 thousand T total piece grocery bulk grain, 2 million 22......
2018-04-23
One berth for 13 000 DWT ship, two berths for 10 000 DWT ships and one tug pen in length of 49 m, total quay length of 634 m, throughput capacity of 500 000 t/year, whar......
2018-04-23
Two berths for the passenger liners up to 223,500 DWT, with the throughput capacity of 500,000 passengers per annum. ...
2018-04-23
One berth for the passenger liners up to 140,000 DWT, with the throughput capacity of 300,000 passengers per annum. Self-boarding vehicle applies to the embarkation and di......
2018-04-23
One berth for the passenger liners up to 150,000 DWT, and two more passenger liner berths are built based on terminal No.6, with the design throughput capacity of 600,000 ......
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC