2019-01-03
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m......
2019-01-03
The dredged island in area of 0.3km2, in the configeration of a round trapezoid, which consists of island wall structure in length of 2321.274m, the passage in length of 220m......
2019-01-03
Double-column blocks for wave energy adsorption...
2019-01-03
Revetment in length of 575.1m, which is constructed with vertical structure and sloping ladder structure....
2019-01-03
A dredged port island in area of approx. 33km2....
2019-01-03
East revetment in length of 895m, south revetment of 982.7m, north revetment of 375m, breakwater of 675.87m, slope protection of 441.35m. South east revetment is constr......
2019-01-03
One berth for the oil tankers ranging from 80,000 DWT to 300,000 DWT, with the throughput capacity of 18 mtpa....
2019-01-03
The design LNG ship with the storage capacity ranging from 125,000 m3 ~267,000 m3. Phase 1 project meets the requirement for the importing LNG at rate of 3.5 mtpa, ......
2019-01-03
One berth for the ship up to 30,000 DWT, which is adaptable to accommodate the liquid chemicals ships ranging from 1,000 DWT to 5,000 DWT simultaneously, with the ......
2019-01-03
Two berths for the liquid chemicals ships up to 10,000 DWT and 100,000 DWT respectively, with the design throughput capacity of 3.7276 mtpa, the shiploading capacity of ......
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC