2019-01-02
Two bridges in length of 232m....
2019-01-02
Railway in length of 47.6km, with the traffic volume of 12.2 mtpa....
2019-01-02
Marine geologic survey of dredged island...
2019-01-02
Railway in length of 11.537km, with grain throughput capacity of 9.1 mtpa....
2019-01-02
Monitoring survey...
2019-01-02
The height of 32.4m....
2019-01-02
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m......
2019-01-02
South breakwater in length of 12279m, which is built with bagged-sandy-soil structure, semicircular structure, and reinforced concrete caisson - cylindrical structure; North......
2019-01-02
A sediment barrier in length of 17.6km, which consists of two 8.8m long levees serving as the extension parts of south and north breakwaters of integrated harbor along the c......
2019-01-03
One ship build dock (Dock 1#) for ships up to 50,000 DWT is laid out in parallel with one ship repair dock (Dock 2#) for ships up to 100,000 DWT....
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC