The geological survey work and the detailed design on the integrated buildings of airport....
2019-01-03
Composed of dry dock, shipway, ship repair berth, outfitting berth and relevant workshops, Xin'gang shipyard has the integrated capability of ship repair and building. The dr......
2019-01-03
Two dry docks for the ships up to 15,000 DWT and 25,000 DWT respectively, and four ship repair berths for the ships up to 30,000 DWT....
2019-01-03
Foundation improvement in area of 813,000 m2....
2019-01-03
Foundation inspection...
2019-01-03
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m......
2019-01-03
The dredged island in area of 0.3km2, in the configeration of a round trapezoid, which consists of island wall structure in length of 2321.274m, the passage in length of 220m......
2019-01-03
Double-column blocks for wave energy adsorption...
2019-01-03
Revetment in length of 575.1m, which is constructed with vertical structure and sloping ladder structure....
2019-01-03
A dredged port island in area of approx. 33km2....
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC