Monday to Friday :8:00-17:00
Fax:022-28341925
Tel:022-28160808
E-mail:fdine@fdine.com.cn
Address:Home > Consultation > Consulting design
2018-04-24
Wide-shoulder breakwater (Beiliang Grain Terminal, Dalian)...
2018-04-24
Beveled hollow block compound structure (Tug pen of Phase 1...
2018-04-24
Semi-circular breakwater (North Breakwater of Tianjin Port)...
2018-04-24
One-way channel in length of 32km and navigable water depth at -11.5m for the ships up to 50,000 DWT, with the side slope scale of 1:5....
2018-04-24
Navigation channel of Qinhuangdao Port...
2018-04-24
Two mole head lights are arranged at north and south sides of breakwater respectively, and supported on circular piled platforms in diameter of 12m and the top elevation of ......
2018-04-24
Dagu Lighthouse of Tianjin Port...
2018-04-24
East radar station of South Harbor in length of 29m, width of 18m, height of 60m and area of 522 m2....
2018-04-24
Deepwater Channel Regulating project at the Estuary of the Yangtze River ...
2018-04-24
Semicircular composite dyke in length of 11.0km and water depth ranging from -1.7~ -4.0m....
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC