中文|ENGLISH

Service >

Monday to Friday :8:00-17:00

Fax:022-28341925

Tel:022-28160808

E-mail:fdine@fdine.com.cn

Download Center >

Container terminalsAddress:Home > Consultation > Consulting design > Ports, terminals > Container terminals > Article

Container Terminal of Phase III Project of Yingkou Port

更新时间:2018-04-23 15:28:40点击次数:1311次
The quay line of the container terminal of Phase III Construction Project of Yingkou Port is 826 m long with the alongside water depth at-14.0 m.It can accommodate one 50 000 DWT, one 35 000 DWT and one 20 000 DWT container vessels in combination, with th
相关介绍
The quay line of the container terminal of Phase III Construction Project of Yingkou Port is 826 m long with the alongside water depth at-14.0 m.It can accommodate one 50 000 DWT, one 35 000 DWT and one 20 000 DWT container vessels in combination, with the annual throughput capacity of 1 000 000 TEU.60 t rail-mounted container quay cranes are used at the front apron,and other container handling and transport equipment used at the stock yard.It is the gravity-type block wharf structure under the deepest water condition in China.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号