Coal dedicated terminalsAddress:Home > Consultation > Consulting design > Ports, terminals > Solid Bulk Cargo Terminals > Coal dedicated terminals > Article

Phase 1 and Phase 2 Coal Terminal at Huanghua Port

更新时间:2018-04-23 15:48:56点击次数:1032次
Phase 1 Coal Terminal has four 35000 dwt berths, in total quay length of 860 m, with annual throughput capacity of 30 mtpa. Phase 2 has two 50000 dwt berths and one 100000 dwt bertb, in total quay length of 840 m, connected to an approach channel of 36.28
相关介绍
Phase 1 Coal Terminal has four 35000 dwt berths, in total quay length of 860 m, with annual throughput capacity of 30 mtpa. Phase 2 has two 50000 dwt berths and one 100000 dwt bertb, in total quay length of 840 m, connected to an approach channel of 36.28 km, with throughput capacity of 60-65 mtpa.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号