中文|ENGLISH

Service >

Monday to Friday :8:00-17:00

Fax:022-28341925

Tel:022-28160808

E-mail:fdine@fdine.com.cn

Download Center >

Airport and ShipyardAddress:Home > Consultation > Consulting design > Airport and Shipyard > Article

Yiyuan Dock Base Phase-1 Project of Dalian

更新时间:2018-04-24 14:26:08点击次数:1202次
Yiyuan dock base of Dalian is composed of a dry dock, ship repair berths, an integrated workshop and other facilities. The dry dock may accommodate the ships up to 60,000 DWT, with a pneumatic flap steel gate, and a pre-fabricated caisson structure as the
相关介绍
Yiyuan dock base of Dalian is composed of a dry dock, ship repair berths, an integrated workshop and other facilities. The dry dock may accommodate the ships up to 60,000 DWT, with a pneumatic flap steel gate, and a pre-fabricated caisson structure as the dock head dolphin. Among the five ship-repair berths, the east wall of the dry dock also serves as one berth in length of 300m, the south revetment serves as another berth for the ships up to 30,000 DWT, and the rest three berths accommodate the ships up to 60,000 DWT.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号