2018-04-24
江苏省连云港田湾核电站装机容量一期为2台100万 kw 级机组,二期为2台100万 kw 级机组。 为了优化和验证设计方案,对海工建筑物进行了多项试验研究工作。包括泥沙回淤物理模型计算;温排水...
2018-04-24
Marine Works of Guangdong Ling'Ao Nuclear Power Station composes of the crossing works of water intake & drainage canal, breakwater, mid-separation levee and the cor......
2018-04-24
The heavy cargo berth....
2018-04-24
Seawater intake & drainage facilities, slope protection & revetment of nuclear power plant, and the heavy cargo berth for receiving power plant's equipment....
2018-04-24
tanks with the capacity of 10,000m3 and four inner floating roof tanks with the capacity of 5,000m3; crude oil is stored in four dome roof tanks and four floating roof tanks w......
2019-01-04
Oil pipeline in length of 15km is arranged along new-built bridge approach and landside pipe support....
2019-01-04
The first coal silo project with the function of environmental protection in China, including 24 coal silos with total storage capacity of 720,000 tons....
2019-01-04
158m distance among six spherical silos in inner diameter of 120m....
2019-01-04
Coal stockyard 1 & 2 enclosing project for Hebei Xingtai Power Generation Co., Ltd. ...
2019-01-04
The stockyard in area of 215,650m2, east-west length of 762m, north-south width of 283m, with the design freight volume at rate of 8.5 mtpa, including coal at rate of 5 m......
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC