Monday to Friday :8:00-17:00
Fax:022-28341925
Tel:022-28160808
E-mail:fdine@fdine.com.cn
Address:Home > Consultation > Consulting design > Airport and Shipyard
2018-04-24
The 300,000 DWT dry dock in Malta was constructed in a project under the aid from China to Malta. The dry dock is 360m long, 62m wide and 10.3m deep. The dry dock is......
2018-04-24
Shanhaiguan shipyard is composed of dry docks, ship repair berths, breakwater and the supporting workshops. The east and west breakwaters are arranged in embracing configur......
2018-04-24
The project of the shipyard included the construction of four shipways for ships ranging from 1 500 DWT to 10 000 DWT, one set of ship lift, a ship traversing area, outfit......
2018-04-24
Yiyuan dock base of Dalian is composed of a dry dock, ship repair berths, an integrated workshop and other facilities. The dry dock may accommodate the ships up to 60,000 D......
2019-01-03
One ship build dock (Dock 1#) for ships up to 50,000 DWT is laid out in parallel with one ship repair dock (Dock 2#) for ships up to 100,000 DWT....
2019-01-03
The geological survey work and the detailed design on the integrated buildings of airport....
2019-01-03
Composed of dry dock, shipway, ship repair berth, outfitting berth and relevant workshops, Xin'gang shipyard has the integrated capability of ship repair and building. The dr......
2019-01-03
Two dry docks for the ships up to 15,000 DWT and 25,000 DWT respectively, and four ship repair berths for the ships up to 30,000 DWT....
2019-01-03
Foundation improvement in area of 813,000 m2....
2019-01-03
Foundation inspection...
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC