Seaside Resort Project at Binhai North Road of Yantai
更新时间:2019-01-04 15:30:38点击次数:1007次
Revetment in length of 1800m, with four functional sections involving wave dissipation, close-to-water, wave-ascending and fountain, among which, the wave dissipating section is constructed with the wall stacked with double-column anti-wave blocks plus th
相关介绍
Revetment in length of 1800m, with four functional sections involving wave dissipation, close-to-water, wave-ascending and fountain, among which, the wave dissipating section is constructed with the wall stacked with double-column anti-wave blocks plus the surface course made of masonry rubble and chopped stones; the close-to-water section is supported on rubble-mound foundation, with masonry rubble wall and granite ladders; the wave-ascending wall is made of precast conical concrete blocks, which can accumulate wave energy to form wave-ascending landscaping; the fountain section is constructed with petal-shaped straight wall, which is a layer of precast concrete blocks where wave can be discharged from the rear outlet between blocks to form fountains.