中文|ENGLISH

Service >

Monday to Friday :8:00-17:00

Fax:022-28341925

Tel:022-28160808

E-mail:fdine@fdine.com.cn

Download Center >

Protective structuresAddress:Home > Consultation > Consulting design > Ports, terminals > Protective structures > Article

Sediment barrier of Jingtang Port

更新时间:2019-01-02 17:37:22点击次数:801次
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m which expands to deepwater area along the channel ranging from -6m to -8m, west par
相关介绍
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m which expands to deepwater area along the channel ranging from -6m to -8m, west parallel barrier in length of 700m which connects to the outer embankment of basin No.5 in length of 4202.7m, with the mole head water depth at -9m and the mole top elevation at 3.65m.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号