Sediment Barrier of Approach Channel for Ships up to 200,000 DWT at Bulk Cargo H

更新时间:2019-01-02 17:38:31点击次数:870次
A sediment barrier in length of 17.6km, which consists of two 8.8m long levees serving as the extension parts of south and north breakwaters of integrated harbor along the channel, and expanding up to the place with the water depth at -8.0m.
相关介绍
A sediment barrier in length of 17.6km, which consists of two 8.8m long levees serving as the extension parts of south and north breakwaters of integrated harbor along the channel, and expanding up to the place with the water depth at -8.0m.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号