Phase 1 to Phase 5 Renovation of Crude Oil Tank Farm at Huan

更新时间:2018-04-23 16:02:44点击次数:843次
Phase 1 has extended the crude oil storage capacity to 220 000 m3; Phase 2 has constructed three tanks each of 50 000 m3 capacity; Phase 3 has included the construction of four tanks each of 50 000 m3 capacity; Phase 4 includes construction of three tanks
相关介绍
Phase 1 has extended the crude oil storage capacity to 220 000 m3; Phase 2 has constructed three tanks each of 50 000 m3 capacity; Phase 3 has included the construction of four tanks each of 50 000 m3 capacity; Phase 4 includes construction of three tanks of 50 000 m3 each; Phase 5 has constructed a tank farm with storage capacity of 840 000 m3.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号