Monday to Friday :8:00-17:00
Fax:022-28341925
Tel:022-28160808
E-mail:fdine@fdine.com.cn
Address:Home > Consultation > Consulting design > Ports, terminals > Protective structures
2018-04-24
Wide-shoulder breakwater (Beiliang Grain Terminal, Dalian)...
2018-04-24
Beveled hollow block compound structure (Tug pen of Phase 1...
2018-04-24
Semi-circular breakwater (North Breakwater of Tianjin Port)...
2019-01-02
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m......
2019-01-02
South breakwater in length of 12279m, which is built with bagged-sandy-soil structure, semicircular structure, and reinforced concrete caisson - cylindrical structure; North......
2019-01-02
A sediment barrier in length of 17.6km, which consists of two 8.8m long levees serving as the extension parts of south and north breakwaters of integrated harbor along the c......
2019-01-03
Phase-2 Project: The reconstruction of east sediment barrier in length of 658m and west barrier in length of 780m. Phase-3 project: East parallel barrier in length of 700m......
2019-01-03
The dredged island in area of 0.3km2, in the configeration of a round trapezoid, which consists of island wall structure in length of 2321.274m, the passage in length of 220m......
2019-01-03
Double-column blocks for wave energy adsorption...
2019-01-03
Revetment in length of 575.1m, which is constructed with vertical structure and sloping ladder structure....
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC